When in 2017 glasses will be raised in Turkmenistan to celebrate the successes during the 5th Asian Games, Horn Glass Industries AG will already have won its own competition.

In March 2016 HORN has signed a complete new project contract with Turira for Mina Glass Co about engineering and equipment for a new 240 tpd regenerative end fired furnace with 3 forehearths.

HORN has signed a contract with company TEPE to provide a complete turn-key plant for production of Float glass and Container bottles.

HORN recently concluded a contract with the company REPXPER for representation in France. Owner and managing director is Mr. Jean-Philippe Martel, who has been active in the glass industry since 1998.

The first time HORN installed an online gas analysis on the furnace 62 at Vetropack in Straza, Croatia. Therefore a flue gas analyzer from ABB Automation GmbH was installed to measure CO, CO2, NO and O2.

Pages