Equipment manufacturing for a 90 t/d all electric furnace

Insights into the HORN production halls: This is where our top electrodes and cooling water skids were manufactured before embarking on their journey to Belgium. This equipment is part of a delivery for the construction of a new 90 t/d all electric glass melting furnace with three production lines.